Pictures: 2003 Mission Projects

Kenyans Build Boys Dormitory

Kenyans Digging.jpg (143286 bytes) Workers Digging Footers.jpg (228085 bytes) Footers Dug.jpg (249018 bytes) Bonnie and Bricks.jpg (168745 bytes) Ruth at Boys Dorm Site.jpg (168474 bytes) Rows of Bricks in Place.jpg (210691 bytes)
Footers Dug 1.jpg (206814 bytes) Footer Poured and Bricks Started.jpg (173553 bytes) Loading Wheel Barrel with Sticky Dirt.jpg (161692 bytes) Covering Rocks with Dirt.jpg (198510 bytes) Covering Dirt with Sticky Dirt.jpg (190392 bytes) Ready to Pour Cement Floor.jpg (202381 bytes)
Preparing to Mix Cement.jpg (193034 bytes) Rocks added to Mixture.jpg (134200 bytes) Cementing Floor.jpg (183712 bytes) Cement Floor Poured and Rows of Bricks Layed.jpg (192000 bytes) Walls Almost Finished as Team Leaves.jpg (162864 bytes) Walls Going Up.jpg (194888 bytes)
72003.jpg (126082 bytes) Almost Finished 2 Oct 2003.jpg (127942 bytes) Almost Finished 1 Oct 2003.jpg (127712 bytes) Finished Building.jpg (217161 bytes)